STANLEY JIM RES. PROJECT

The Bitadur & Bitaflex waterproofing system was applied at the C.R. & Terraces / Gutter and Wall.

EAST BLDG. RES.

- The 3CC System is incorporated into the on-ground swimming pool.

WOODLAND HILLS SUBD.

The 3CC System is incorporated into the inground swimming pool.

TEFASCO BANANA WAREHOUSE

The EDC System was incorporated into all in- ground concrete structures (e.g. footing and tie beams) of the banana warehouse as a protection against the highly corrosive salt water in the ground water table.

Ocean Star Bldg.

The Mariseal 250 was incorporated into the paraphet walls.
The Mariseal 250 & 420 was incorporated into the roofdecks.
The Mariseal 270 & 420 was incorporated into the parking areas.
The Mariseal 270 was incorporated into the T&Bs.
The Stopox WL-100 was incorporated into the Underground Level slab and walls.
The UniDri S20 was incorporated into the Cistern Tanks.

MAKRO- LAS PINAS

- The 3CC System is incorporated into the cistern tank/ suspended slab.

EVERHOUSEWARE WAREHOUS

- The EDC System was incorporated into the cold storage base slab waterproofing.

FILIPINAS MAKRO

- The 3CC System was incorporated into the 2nd level parking area waterproofing.

HIZON LAB. WAREHOUSE

The Gripset 51 was applied into the retaining wall

MERCEDES BLDG.

- The 3CC System is incorporated into the retaining wall.

DOLE PHILS.

The EDC System was incorporated into the sugar room area to prevent sugar acid from penetrating.

Tivoli Garden

The Bitaflex was incorporated into the Sky Garden Deck -Slab.

BAY WATCH HILLS

- The 3CC System is incorporated into the portion of mat foundation, elevator pit, machine room, podium deck, and roof deck waterproofing.

UP Los Banos

The Cementseal Epoxy was incorporated into the Beam and Column Concrete Topping.

MAKATI PALM TOWER

The Mariseal 250/260/400 was incorporated into the concrete walls. The Uni Dri Super 20 was incorporated into the water tank.

J. Mall

The Cementseal 1 was incorporated into the slab.

BAUAN PIER REHAB

- The 3CC System is incorporated to the rehabilitation of the pier.

TIVOLI GARDENS

- The 3CC System is incorporated into the plaza deck.