The Diamite was incorporated into the New Building, Underground Walkway. The Mariseal 250 was incorporated into the roof concrete gutter. The Stocrete 4222 was incorporated into the elevator pit. The Mariseal 270 was incorporated into the toilets & upstand wall.
The Boscoseal PU was incorporated into the ACCU Ledge, Linen Room, Toilets, Pantry, Utility Room. The Cementseal TLE was incorporated into the cistern tanks.
The Maritrans, Stoseal SPS-A, Mariseal 250 and Bitadur Membrane was applied at the podium deck, GI Roofing. Skylight, Roofdeck/ Gutter, Parapet Wall @ Roofdeck stair/machine room wall ledge.