The Integral Waterproofing System is incorporated into Suspended slab and swimming pool.
- The EDC System was incorporated into the basement wall, basement slab, and roof deck slab waterproofing.
- The 3CC System is incorporated into the top 300mm of mat foundation at gridline 1, retaining wall and shear wall waterproofing.
- The EDC was incorporated into the replacement of factory floor slab
The Bitaflex was incorporated into the roofdeck, plant box, T&B.
The Hycrete W1000 is incorporated intoPressure Slab. The Hycrete W400 is incorporated into retaining wall.
- The 3CC System was incorporated into the cistern tank.
The Cementseal 1 injection was incorporated into beams/honeycomb
- The 3CC System is incorporated into the in ground swimming pool.
The EDC System is incorporated into the of the floor slab for acid protection.
The 3CC System is incorporated into the retaining wall, slab, sump pit, basement.
- The 3CC Systems was incorporated at the Cistern Tank
- The 3CC System was incorporated into the podium deck waterproofing.
The Diamite & Rokite was applied into the gutter areas.
The Mariseal 250 was incorporated into the roofdeck.
The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the Driveway, Landscape & Tennis Court, Ground Floor, Toilet & Basement, and all toilet.
The Rokite was applied into the flooring area.
The 3CC System is incorporated into the Roofdeck Slab Parking Bldg.
The 3CC System was incorporated into the ground floor parking area and suspended slab waterproofing.