ASCEND BLDG.

The Bitaflex was incorporated into the C.R., bar and balcony.

ROBINSON'S PLACE-

The Rokite (grey) floor sealer was applied into the substation genset area.

SUNNYMED LAND

The Diamite & Rokite was applied into the production area.

Ocean Star Bldg.

The Mariseal 250 was incorporated into the paraphet walls.
The Mariseal 250 & 420 was incorporated into the roofdecks.
The Mariseal 270 & 420 was incorporated into the parking areas.
The Mariseal 270 was incorporated into the T&Bs.
The Stopox WL-100 was incorporated into the Underground Level slab and walls.
The UniDri S20 was incorporated into the Cistern Tanks.

FUJITSU DIE - TECH

The Diamite was applied into the production area.

J. MANABAT APARTMENTS (MAMBALING)

The Bitadur & Bitaflex waterproofing system was applied at the Roofdeck, C.R., Walls ways and Ledges.

LPG PIER FEINDER

The Cementseal 1 is incorporated to the pier deck.

ANACONDA WAREHOUSE

The Rokite (clear) floor sealer and Diamite was applied into the hallway and loading area.

Manila Memorial Park Bldg.

The Mariseal 270 & 250 was incorporated into the roof concrete gutter & canopy.

FORTUNE STAR CONDO

The Power mix was applied into the roofdeck area, elevetor pit, Toilets & Baths

CEBU HILTON HOTEL RESORT

The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the Driveway, Landscape & Tennis Court, Ground Floor, Toilet & Basement, and all toilet.

PANCAKE HOUSE CENTER

The Mariseal 250 was incorporated into the parapet wall and ledges.

ABENSON'S ALABANG

The Gripset RD was applied into the roofdeck.

INTEL CV-1 FACILITY PROJ.

The manufacturing building- ground floor machine rooms, storage rooms, CW area substations, direct and indirect materials area, UPS rooms, utility building, administration building, machine room & equipment pads with a total area of 11, 050m2 were treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer.

Ateneo De Manila

The Mariseal 250 was incorporated into the concrete gutter, canopy, bridgeway deck. The StoCrete CCW-Elastic was incorporated into the M & F toilets.

MARKET! MARKET1

The Diamite was applied at the basement, parking area, hallway

PETRON BATAAN REFINERY

The Mariseal 260 was incorporated into the roofdeck.

WALTERMART-DASMA

The Gripset 51 was applied into the roof deck area.