ASIAN STAR TOWER

- The 3CC System was incorporated into the basement retaining wall (3 level) & cistern tank waterproofing.

SM GROUP COR. OFFICE

- The EDC System was incorporated into the concrete sections of the roof deck.

SM MOA

- The 3CC was incorporated at the beam and slab

PACIFIC PLAZA

- The 3CC System was incorporated into the suspended swimming waterproofing.

ROYAL PALM RESIDENCES

- The 3CC System is incorporated into the swimming pool.

ROCKWELL CENTER

- The EDC System was incorporated into the water tank wall, ground floor slab, suspended swimming pool/ tank waterproofing.

BAUAN PIER REHAB

- The 3CC System is incorporated to the rehabilitation of the pier.

Venice Corporate Center

The Integral Waterproofing System is incorporated into vehicular ramp, parking, driveway, and roof deck.

JOSE "BOY" SY RESIDENCE

The 3CC System is incorporated into the swimming pool

CICERON RESIDENCE

The 3CC System was incorporated into the 2 level basement retaining wall.

FILIPINAS MAKRO

- The 3CC System was incorporated into the 2nd level parking area waterproofing.

BONIFACIO HEIGHTS

- The 3CC System is incorporated into the inground swimming pool.

EQUITABLE BANK TOWER

- The 3CC System was incorporated into the domestic water tank top slab that is also the parking area runway to eliminate the need for protective topping.

MRS. SISON'S RESIDENCE

- The EDC System is incorporated into the roof deck area.

PPI- Rehabilitation of Fender Systems

- The 3CC System is incorporated into the rehabilitation of the existing fender system.

CAYLABNE RESORT STP

- The 3CC System will be used in the STP waterproofing.

WYETH PHILS.

The 3CC System is incorporated into the podium.

UP PGH

The 3CC System is incorporated into the cistern tank.

Pioneer Woodlands

The Integral waterproofing System is incorporated into roofdeck and machine room.