BAUAN PIER REHAB

- The 3CC System is incorporated to the rehabilitation of the pier.

Venice Corporate Center

The Integral Waterproofing System is incorporated into vehicular ramp, parking, driveway, and roof deck.

SM MOA

- The 3CC was incorporated at the beam and slab

PACIFIC PLAZA

- The 3CC System was incorporated into the suspended swimming waterproofing.

FILIPINAS MAKRO

- The 3CC System was incorporated into the 2nd level parking area waterproofing.

BONIFACIO HEIGHTS

- The 3CC System is incorporated into the inground swimming pool.

EQUITABLE BANK TOWER

- The 3CC System was incorporated into the domestic water tank top slab that is also the parking area runway to eliminate the need for protective topping.

MRS. SISON'S RESIDENCE

- The EDC System is incorporated into the roof deck area.

JOSE "BOY" SY RESIDENCE

The 3CC System is incorporated into the swimming pool

CICERON RESIDENCE

The 3CC System was incorporated into the 2 level basement retaining wall.

WYETH PHILS.

The 3CC System is incorporated into the podium.

UP PGH

The 3CC System is incorporated into the cistern tank.

Pioneer Woodlands

The Integral waterproofing System is incorporated into roofdeck and machine room.

PPI- Rehabilitation of Fender Systems

- The 3CC System is incorporated into the rehabilitation of the existing fender system.

CAYLABNE RESORT STP

- The 3CC System will be used in the STP waterproofing.

HICAP IV

- The 3CC System was incorporated into the base slab and walls waterproofing.

ROSEWOOD POINTE

- The 3CC System is incorporated into the in ground swimming pool.

THE ENTERPRISE CENTER

- The 3CC System was incorporated into the basement retaining wall (7 level), ramps, and cistern tank waterproofing.

EAST BLDG. RES.

- The 3CC System is incorporated into the on-ground swimming pool.