- The 3CC System will be used in the STP waterproofing.
The 3CC System is incorporated into the podium.
The 3CC System is incorporated into the cistern tank.
The Integral waterproofing System is incorporated into roofdeck and machine room.
The 3CC System was incorporated into the basement retaining wall (3 level) waterproofing.
- The 3CC System was incorporated into the base slab and walls waterproofing.
- The 3CC System is incorporated into the in ground swimming pool.
- The 3CC System was incorporated into the basement retaining wall (7 level), ramps, and cistern tank waterproofing.
- The 3CC System is incorporated into the on-ground swimming pool.
- The 3CC was incorporated at the Cistern Tank & Elevator Pit
- The 3CC System was incorporated into the on- ground swimming pool waterproofing.
- The 3CC System is incorporated into the slab and wall of the watertank
- The 3CC System was incorporated into the lowest level (3rd level) basement retaining wall waterproofing.
- The EDC System is incorporated into the roof deck.
The Integral Waterproofing System is incorporated into pressure and retaining wall.
The 3CC System is incorporated into the swimming pool.
The EDC System was incorporated into the roof deck waterproofing.
- The 3CC System was incorporated into the basement retaining (level 1).